How to create a Multiple Pies chart

A multiple pies chart is useful when you want to show proportional parts of multiple wholes and want to give the reader an extra data point in the middle. The individual pies should not have too many slices, as the chart otherwise gets cluttered and hard to read – if you want to show more than five parts per pie, consider grouping them. 

Below is an example of a multiple pies chart that makes good use of the part of the whole concept. We can see the shares of three countries' wealth that the bottom 50%, the next 40% and the top 10% of citizens own:

1

Preparing and importing the data

If you want to create this chart type, your data needs to be in a certain format. You'll need:

  • One header row containing descriptive labels.
  • One column containing at least two categories. This will determine the label in the pie slices. In our case, that's "bottom 50%", "next 40%" and "top 10%. 
  • At least one column containing numeric values. The values in the second, third, etc. column will define the size of the pie slices. In your final chart, one numerical column will result in one extra pie. The more numerical columns you upload, the more pies your chart will have.

The most important thing you have to keep in mind is that a pie chart always represents a whole, i.e. 100%. Therefore, you can only use data that is based on exclusive values. Making a pie chart of a survey that allows multiple answers will lead to a misleading chart. Use a bar chart instead, but never a pie chart. 

That's the data we used to create the chart at the top of the page:

category Canada China Norway
bottom 50% 5.6 11.0 1.1
next 40% 46.7 40.6 49.4
top 10% 47.7 48.4 49.5

Source: Credit Suisse Global Wealth Databook 2018

Once you prepared your data, create a new chart in Datawrapper. You can do so by going to our homepage and clicking on "Create a chart". In Step 1: Upload, copy & paste your dataset, upload it as a .csv or an Excel sheet.  After pasting the data above into Datawrapper, it will look like this: 

Click "P roceed" at the bottom right to go to the next step:  

2

Check & Describe

In the second step, you can check if your dataset was imported correctly and make changes to it - if necessary. If you did not upload a header row, you have to untick "First row as label" to avoid losing your first row of data. Always remember to do this if you don't have descriptive row and column headers.

In step 2, your data looks like this. You can see that Datawrapper correctly recognized your numbers as numbers (and not as text or dates) because they are colored in blue and are right-alined. To learn more about the Datawrapper's automatic recognition of data formats, visit this article.

Click on "Proceed" at the bottom left to go to Step 3: Visualize:

3

Visualize

In this step, you see a first chart. It's probably a line chart. We want to change that. To do so, click on the "Multiple Pies" symbol in the grid of available chart types:

You will now see a multiple pies chart, without a title, descriptions or customized colors. Maybe you want to further refine, annotate & define this chart. We cover this in a separate short tutorial found here . 

Still need help? Contact Us Contact Us